Amazon needed interior health center wall graphics installed at its SOR3 facility in Portland, Oregon.

Wall Graphics

Challenge

Amazon needed interior health center wall graphics installed at its SOR3 facility in Portland, Oregon. The project included multiple wall areas inside an active warehouse facility. Several walls required patching and painting, while two additional walls required a specialty wall sealer that needed a full 24-hour cure before graphics could be installed. The project also served as a training opportunity for installers gaining more experience with wall preparation techniques.

AP Approach

AP completed the project over two installation phases separated by the required curing time. During the first visit, a three-person crew patched and painted two walls while applying a specialty wall sealer to two additional walls. After allowing the sealer to fully cure, the crew returned two days later to install the 3M IJ180 wall graphics across all prepared surfaces. Wall fixtures were removed and reinstalled as needed to ensure a clean, finished appearance.

Timeline

Two-phase project completed over two separate installation days, with a two-day cure period between wall preparation and final graphic installation. Final installation completed March 17, 2026.

Key Wins

  • Two walls patched and painted before installation
  • Two additional walls treated with specialty wall sealer requiring a 24-hour cure
  • Crew returned two days later to install 3M IJ180 wall graphics
  • Wall fixtures removed and reattached as part of the installation
  • Training opportunity completed successfully for installers building wall preparation experience
  • No return visit required after project closeout
Completed multilingual health center wall graphics at Amazon SOR3
Project TypeInterior Wall Graphics
LocationAmazon SOR3, Portland, Oregon
TimelineTwo installation days with a two-day cure period between wall preparation and graphic installation (completed March 17, 2026)
Materials3M IJ180 vinyl graphics, wall patch, paint, and specialty wall sealer
CrewThree-person AP crew
ClientAmazon
Additional ScopeWall patching, painting, specialty wall sealer application, and fixture reattachment

Project Photos

See the Finished Work.

Completed thank-you wall graphic inside Amazon SOR3
Completed multilingual entrance wall graphics at the Amazon SOR3 health center
Amazon SOR3 health center wall graphics after surface preparation and installation